LEMON Manuals: Even more car manuals for everyone
Home >> Land Rover >> 2018 >> Range Rover Velar Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 1 (Body Panel System - Front End Body Panels -- Range Rover Velar/L560) >> Front End Body Panels >> Removal And Installation >> Secondary Bulkhead Right Panel - TDV6 3.0L Diesel (G2020324) >> Installation

Secondary Bulkhead Right Panel - TDV6 3.0L Diesel (G2020324): Installation

WARNING: This page is about a different car, the 2019 Land Rover Range Rover Velar. However, it is still accessible from the selected car via links, so may be relevant.
    • Install the secondary bulkhead right panel.
    • Install and tighten the 5 bolts.

      Torque  : 5.4 Nm 

    • Install the coolant pipe assembly.
    • Connect and secure the 4 coolant hoses.
    • Install and tighten 2 bolts.

      Torque  : 10 Nm 

    • Install the wiring harness bracket.
    • Install and tighten the 4 bolts.

      Torque  : 10 Nm 

    • Install the wiring harness clip to the bracket.
    • Install the pipe clip onto the pipe.
    • Install the fuel filter.
    • Install the clip.
    • Connect the ground cable connector.
    • Install the brake vacuum pipe to the bulkhead panel.
    • Connect the brake vacuum pipe connector.
    • Install the engine wiring harness to the bulkhead panel.
    • Connect the 2 electrical connectors.

      Torque  : 3.6 Nm 

    • Install the rear engine cover.
    • Install and tighten the 4 bolts.

      Torque  : 10 Nm 

    • Install the 3 wiring harness clips.
    • Install the engine wiring harness cover.
    • Install the engine compartment brace.
    • Install and tighten the 4 bolts.

      Torque  : 55 Nm 

  1. Install the cowl panel.

    Refer to: COWL PANEL 

  2. Install the engine cover.

    Refer to: ENGINE COVER - TDV6 3.0L DIESEL

  3. Connect the startup battery ground cable.

    Refer to: STARTUP BATTERY DISCONNECT AND CONNECT

  4. Fill the engine coolant system.

    Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING