Component Inspection
WARNING: This page is about a different variant/trim than selected.
■ Check PCSV
- Connect KDS/GDS to Data Link Connector (DLC).
- Ignition "ON" & ENG "OFF"
- Perform "ACTUATION TEST " for PCSV.
- Ignition "OFF"
- Disconnect PCSV connector.
- Measure resistance between power and control terminal of the PCSV. (Component Side)
Specification: Approx. 2.0kΩ [20°C (68°F)]
YES
- Go to "Check injector for normal operation" as follows.
NO
- Replace it, and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
■ Check injector for normal operation
- Connect KDS/GDS to Data Link Connector (DLC).
- Perform "ACTUATION TEST " for Injector.
- Check its RPM decrease when doing the injector's actuation test.
- Is there any cylinder with no change in RPM or only a small change in RPM?
YES
- Replace injector, and go to "VERIFICATION OF VEHICLE REPAIR " procedure.
NO
- Go to "VERIFICATION OF VEHICLE REPAIR " procedure.