Antenna, Long-Term Evolution 2 (LTE2): Installation
- Connect the wire harness connector (2) to the Long Term Evolution 2 (LTE2) antenna.
- Position the LTE2 antenna to the instrument panel carrier, then install the fasteners (1) and tighten them securely.
- Position and secure the instrument panel wire harness in its original location.
- Install the instrument panel cover. Refer to PAD, INSTRUMENT PANEL, INSTALLATION .
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.