  1. Clean the gasket mating surfaces.
    GC0163135Courtesy of CHRYSLER GROUP, LLC
  2. Install a NEW  thermostat housing gasket (1).
    GC0177082Courtesy of CHRYSLER GROUP, LLC
  3. Rotate the loop clamp (1) clockwise at least 45° away from the thermostat mounting surface.
    GC0176939Courtesy of CHRYSLER GROUP, LLC
  4. Pull the intake manifold upper support bracket (1) slightly away from the engine and install the thermostat housing (2).
    GC0176995Courtesy of CHRYSLER GROUP, LLC
  5. Rotate the loop clamp (1) back into position against the thermostat housing flange.
    GC0163577Courtesy of CHRYSLER GROUP, LLC
  6. Install the thermostat housing bolts (1) hand tight.
    GC0165896Courtesy of CHRYSLER GROUP, LLC
  7. Install the fasteners (1a) to the intake manifold upper support bracket (1b) and tighten securely.
    GC0165638Courtesy of CHRYSLER GROUP, LLC
  8. Bend the loop clamp end tab (1a) and install the last thermostat bolt (1b). Tighten the thermostat housing bolts in a crisscross pattern to the proper specification. Refer to TORQUE SPECIFICATIONS  .
    GC0165301Courtesy of CHRYSLER GROUP, LLC
  9. Install the degas hose (1) to the thermostat housing and connect the quick-connect fitting.
    GC0165839Courtesy of CHRYSLER GROUP, LLC
  10. Install the coolant hose to the thermostat housing and secure the quick-connect coupling (2).
  11. Connect and lock the Engine Coolant Temperature (ECT) sensor wire harness connector (1).
    GC0162999Courtesy of CHRYSLER GROUP, LLC
  12. Install the radiator hose (1) to the thermostat housing and securely tighten the clamp.
  13. Install the battery tray and battery. Refer to TRAY, BATTERY, INSTALLATION .
  14. Fill the cooling system. Refer to DRAINING AND FILLING THE COOLING SYSTEM - 2.4L  .
  15. Install the engine cover. Refer to COVER, ENGINE, REMOVAL AND INSTALLATION .
  16. Start engine and check for leaks.
  17. Run the engine until it reaches normal operating temperature. Check the cooling system for correct fluid level. Refer to ADDING ADDITIONAL COOLANT  .