LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2019 >> Renegade High Altitude, 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1286 (2.4L Engine (Service Information)) >> Manifolds >> Manifold, Intake >> Removal And Installation >> Installation

Removal And Installation: Installation

WARNING: This page is about a different car, the 2020 Jeep Renegade. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Intake Manifold Tightening Sequence
GC0188494Courtesy of CHRYSLER GROUP, LLC
  1. Using NEW  gaskets, install the intake manifold and using the sequence shown, tighten the fasteners to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  2. Install the intake manifold support bracket nuts and securely tighten.
  3. Install the intake manifold lower support bracket bolt and securely tighten.
  4. Install the intake manifold silencer cover and securely tighten the four screws.
  5. Install the fuel rail and fuel injectors. Refer to INJECTOR(S), FUEL, REMOVAL AND INSTALLATION .
  6. Install the coolant hoses (2) to the heater.
  7. Using NEW  gasket seals, connect the A/C lines and securely tighten the nuts.
  8. Attach the A/C lines into retaining clip and close the clip.
  9. Install the fuel vapor solenoid and connect the wire harness connector.
  10. Connect the fuel vapor hose quick connect fitting.
  11. Install the sound absorbing panel.
  12. Install the fuel vapor hose and connect the fuel vapor hose quick connect fitting.
  13. Connect the fuel vapor hose quick connect fitting and close the retaining clip.
  14. Evacuate the refrigerant system. Refer to R-1234YF REFRIGERANT SYSTEM EVACUATE .
  15. Charge the refrigerant system. Refer to R-1234YF REFRIGERANT SYSTEM CHARGE .
  16. Fill the cooling system. Refer to DRAINING AND FILLING THE COOLING SYSTEM - 2.4L .
  17. Install the throttle body. Refer to THROTTLE BODY, REMOVAL AND INSTALLATION .
  18. Install the cylinder head cover. Refer to COVER(S), CYLINDER HEAD, REMOVAL AND INSTALLATION  .
  19. Install the engine cover. Refer to COVER, ENGINE, REMOVAL AND INSTALLATION  .
  20. Install the belly pan. Refer to BELLY PAN, REMOVAL AND INSTALLATION .
  21. Connect the negative battery cable.