LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2005 >> Wrangler Rubicon, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 500 (2.4L Engine (Service Information)) >> Cylinder Head >> Installation >> Installation - Cylinder Head

Installation - Cylinder Head

WARNING: This page is about a different car, the 2005 Jeep Liberty. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: The Cylinder head bolts should be examined BEFORE reuse. If the threads are necked down, the bolts must be replaced. See Fig 1.

Necking can be checked by holding a scale or straight edge against the threads. If all the threads do not contact the scale, the bolt should be replaced.

Fig 1: Checking Cylinder Head Bolts for Stretching (Necking)
GC0003797Courtesy of DAIMLERCHRYSLER CORP.
1 - STRETCHED BOLT
2 - THREADS ARE NOT STRAIGHT ON LINE
3 - THREADS ARE STRAIGHT ON LINE
4 - UNSTRETCHED BOLT
  1. Before installing the bolts, the threads should be coated with engine oil.
  2. Position cylinder head gasket on engine block. See Fig 2.
    Fig 2: Cylinder Head Gasket Positioning
    GC0021188Courtesy of DAIMLERCHRYSLER CORP.
    1 - PART NUMBER FACES UP
    2 - NO. 1 CYLINDER
  3. Install cylinder head on engine block.
  4. Tighten the cylinder head bolts in the sequence shown in Fig 3. Using the 4 step torque turn method, tighten according to the following values:
    1. First All to 34 N.m (25 ft. lbs.)
    2. Second All to 68 N.m (50 ft. lbs.)
    3. Third All to 68 N.m (50 ft. lbs.)
      CAUTION: Do not use a torque wrench for the following step.
    4. Fourth Turn an additional 1/4 Turn,
    Fig 3: Cylinder Head Tightening Sequence
    GC0021185Courtesy of DAIMLERCHRYSLER CORP.
  5. Install rocker arms. (Refer to ENGINE/CYLINDER HEAD/ROCKER ARMS - INSTALLATION) 
  6. Install camshafts. (Refer to ENGINE/CYLINDER HEAD/CAMSHAFT(S) - INSTALLATION) .
  7. Install cylinder head cover. (Refer to ENGINE/CYLINDER HEAD/CYLINDER HEAD COVER(S) - INSTALLATION) 
  8. Install timing belt rear cover and timing belt idler pulley. (Refer to ENGINE/VALVE TIMING/TIMING BELT / CHAIN COVER(S) - INSTALLATION) 
  9. Install timing belt and camshaft sprockets. (Refer to ENGINE/VALVE TIMING/TIMING BELT/CHAIN AND SPROCKETS - INSTALLATION) 
  10. Connect cam sensor and fuel injectors wiring connectors.
  11. Install ignition coil and wires. Connect ignition coil wiring connector.
  12. Install accessary drive bracket.
  13. Install power steering pump to cylinder head.
  14. Raise vehicle and install the exhaust pipe to the manifold.
  15. Install accessory drive belts. (Refer to COOLING/ACCESSORY DRIVE/DRIVE BELTS - INSTALLATION)
  16. Install heater tube support bracket to cylinder head.
  17. Install intake manifold.
  18. Connect all vacuum lines, electrical wiring, ground straps and fuel line.
  19. Fill cooling system. (Refer to COOLING - STANDARD PROCEDURE)
  20. Connect battery negative cable.