LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 1996 >> Grand Cherokee Limited, 5.2 Y >> Repair and Diagnosis >> External Pages >> Different car >> Section 178 (5.2L V8 Gas - VIN [Y]) >> Removal & Installation >> Engine R & I >> Installation (Ram Van/Wagon)

Installation (Ram Van/Wagon)

WARNING: This page is about a different car, the 1995 Jeep Grand Cherokee, 1995 Dodge Ram Wagon, 1995 Dodge Ram Van, 1995 Dodge Pickup, and 1995 Dodge Dakota. However, it is still accessible from the selected car via links, so may be relevant.
  1. To install, reverse removal procedure. Install engine with oil pan and oil pump removed. Before installing oil pan, place a small amount of RTV sealant at corners where side and front oil pan gaskets meet.
  2. Tighten the bolts/nuts to specification. Refer to, at the end of this article, TORQUE SPECIFICATIONS . On A/T models, ensure reference marks on torque converter and flexplate are aligned. Evacuate and charge A/C system.