LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 1991 >> Value Van 7.4 N >> Repair and Diagnosis >> External Pages >> Different car >> Section 90 (3.8L V6 Gas - VIN [L]) >> Removal & Installation >> Intake Manifold >> Installation

Intake Manifold: Installation

WARNING: This page is about a different car, the 1995 Plymouth Grand Voyager, 1995 Dodge Grand Caravan, and 1995 Chrysler Town & Country. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ensure sealing surfaces are clean. Apply 1/4" (6.4 mm) diameter drop of silicone sealant in 4 corners where intake manifold contacts cylinder head.
  2. Install intake manifold gasket. Tighten intake manifold gasket end seal bolts to specification. See TORQUE SPECIFICATIONS . Install intake manifold. Tighten intake manifold bolts to specification in sequence. Refer to TORQUE SPECIFICATIONS . Refer to Figure.
  3. To install remaining components, reverse removal procedure. Ensure injector holes are clean.
  4. Lubricate fuel injector "O" rings with engine oil before installing.
  5. Install fuel injector until firmly seated in port on intake manifold. Install and tighten fuel rail bolts to specification. See TORQUE SPECIFICATIONS .
  6. Install gasket and air intake plenum with bolts finger tight. Loosely install alternator bracket-to-intake manifold bolt and cylinder head-to-intake manifold brace bolts.
  7. Tighten air intake plenum bolts to specification in sequence. See Figure. Tighten alternator bracket and intake manifold brace bolts to specification. See TORQUE SPECIFICATIONS .
  8. Use proper procedure when installing fuel lines. Refer to FUEL LINE DISCONNECT FITTING .
  9. Fill and bleed cooling system. See COOLING SYSTEM BLEEDING .