Pinpoint Test E: PC-A (Line Pressure) Solenoid
.
- E1 CHECK VEHICLE HARNESS FOR CONTINUITY
- Key in OFF position.
- Disconnect transmission powertrain control module (PCM) connector.
- Inspect for damage or pushed out pins, corrosion or loose wires.
- Disconnect vehicle harness from transmission, inspect for damage or pushed out pins, corrosion or loose wires.
- Measure resistance between the appropriate pin at the transmission PCM connector, harness side and the signal pin 10 at transmission harness connector.
- Measure resistance between the appropriate pin at the transmission PCM connector, harness side and the power pins 7, 20, and 24 at the transmission harness connector.
- Is each resistance less than 5.0 ohms?
Yes : GO to E2.
No : REPAIR an open. RECONNECT all components. REPEAT Quick Test.
- E2 CHECK VEHICLE HARNESS FOR SHORTS TO POWER AND GROUND
- Measure resistance between the appropriate pin at the transmission PCM connector, harness side and power pins 7, 20, and 24.
- Measure resistance between the appropriate pin at the transmission PCM connector, harness side and chassis ground.
- Is each resistance greater than 10,000 ohms?
Yes : GO to E3.
No : SERVICE short circuit. RECONNECT all components. REPEAT Quick Test.
- E3 CHECK FOR TRANSMISSION INTERNAL HARNESS
- Drain the transmission fluid.
- Remove the transmission fluid pan.
- Disconnect: Affected solenoid.
- Measure the resistance between pin 10 transmission bulkhead side and pin 2 at the solenoid connector.
- Measure the resistance between pins 7, 20 and 24 transmission bulkhead side and pin 1 at each associated solenoid connector.
- Are the resistances less than 0.5 ohms?
Yes : GO to E4.
No : INSTALL a new harness. RECONNECT all components. REPEAT Quick Test.
- E4 CHECK FOR A SHORT TO GROUND
- Measure the resistance between pins 10 harness side and ground.
- Is the resistance greater than 10,000 ohms?
Yes : GO to E5.
No : INSTALL a new harness. RECONNECT all components. REPEAT Quick Test.
- E5 CHECK THE SOLENOID RESISTANCE AT THE SOLENOID
- Measure the resistance between pins 1 and 2 at each solenoid.
- Is the resistance for PCA solenoid between 4.88-5.48 ohms ?
Yes : GO to E6.
No : INSTALL a new solenoid if not within specifications. CLEAR the DTCs. TEST the system for normal operation.
- E6 CHECK THE SOLENOID FOR A SHORT TO GROUND
- Measure the resistance between pins 1 and 2 at each solenoid and ground.
- Is the resistance greater than 10,000 ohms?
Yes : INSTALL a new PCM. If the condition persists. REFER to DIAGNOSIS BY SYMPTOM in this section for diagnosis of pressure concerns. CLEAR the DTCs. TEST the system for normal operation.
No : INSTALL a new solenoid. CLEAR the DTCs. TEST the system for normal operation.