Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- ACTIVE DTC NOTE:
If DTC P21CA, P21CB, or P21CC are also active, diagnose and repair that DTC before continuing with this test procedure.
- Turn the ignition on, engine not running.
- With the scan tool, actuate the DEF Line Heater or Tank Heater Override Test.
- With the scan tool, View DTCs.
Is the DTC Active?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION - 6.7L. Refer to STANDARD PROCEDURE .
- CHECK THE SCR RELAY 1
- Turn the ignition off.
- Remove the SCR Relay 1 from the PDC.
- Replace the SCR Relay 1 with a known good relay.
- Turn the ignition on, engine not running.
- With the scan tool, View DTCs.
Did the DTC change to stored?
Yes
- Replace the SCR Relay 1.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Go To 3.
- CHECK THE (F203) SCR MODULE HEATER SUPPLY CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Turn the ignition off.
- Remove the SCR Relay 1 from the Auxiliary PDC.
- Disconnect the DEF Dosing Control Unit C1 harness connector.
- Measure the resistance of the (F203) SCR Module Heater Supply circuit between the SCR Relay 1 and the DEF Dosing Control Unit C1 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 4
No
- Repair the (F203) SCR Module Heater Supply circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- CHECK THE (F203) SCR MODULE HEATER SUPPLY CIRCUIT FOR A SHORT TO GROUND
- Measure the resistance between ground and the (F203) SCR Module Heater Supply circuit at the DEF Dosing Control Unit C1 harness connector.
Is the resistance above 10k Ohms?
Yes
- Go To 5
No
- Repair the (F203) SCR Module Heater Supply circuit for a short to ground.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- Measure the resistance between ground and the (F203) SCR Module Heater Supply circuit at the DEF Dosing Control Unit C1 harness connector.
- CHECK THE PDC OUTPUT
- Reinstall the SCR Relay 1.
- Turn the ignition on, engine not running.
- Measure the voltage of the (F203) SCR Module Heater Supply circuit at the DEF Dosing Control Unit C1 harness connector.
Is the voltage approximately equal to battery voltage?
Yes
- Replace the DEF Dosing Control Unit in accordance with the service information. Refer to UNIT, DIESEL EXHAUST FLUID DOSING CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Check the fuse in the Auxiliary PDC for the DEF Heater. Check the connectors at the DEF Dosing Control Unit and PDC for spread terminals causing an intermittent connection. If the fuse and connectors are good, replace the Auxiliary PDC.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .