Diagnostic Test
WARNING: This page is about a different car, the 2013 RAM 3500 HD and 2013 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
- ACTIVE DTC
- Turn the ignition on.
- With the scan tool, erase DTCs.
- Turn the ignition off for 75 seconds.
- Start the engine and let idle for up to five minutes.
- With the scan tool, read DTCs.
Did the DTC reset?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to STANDARD PROCEDURE .
- CHECK THE (K20AB) GENERATOR FIELD CONTROL 2 CIRCUIT FOR A SHORT TO VOLTAGE
- CHECK THE GENERATOR FOR A SHORT TO VOLTAGE
- Disconnect the Generator 2 field harness connector.
- Turn the ignition on.
- Measure the voltage on the (K20AB) Generator Field Control 2 circuit at the Generator 2 harness connector.
Is there any voltage present?
Yes
- Repair the (K20AB) Generator Field Control 2 circuit for a short to voltage.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Replace Generator 2 in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- CHECK THE (K20AB) GENERATOR FIELD CONTROL 2 CIRCUIT FOR AN OPEN/HIGH RESISTANCE
- Measure the resistance of the (K20AB) Generator Field Control 2 circuit between the Generator 2 harness connector and the PCM C2 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Replace the Powertrain Control Module in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
No
- Repair the (K20AB) Generator Field Control 2 circuit for an open or high resistance.
- Perform the POWERTRAIN VERIFICATION TEST - 6.7L. Refer to STANDARD PROCEDURE .
- Measure the resistance of the (K20AB) Generator Field Control 2 circuit between the Generator 2 harness connector and the PCM C2 harness connector.