Cylinder Head: Installation
WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:
THE OUTSIDE EDGE OF THE HEAD GASKET IS VERY SHARP. WHEN HANDLING THE NEW HEAD GASKET, USE CARE NOT TO INJURE YOURSELF.
- Clean the gasket sealing surfaces. Refer to ENGINE GASKET SURFACE PREPARATION .
- Install a NEW cylinder head gasket with the part number side up, and locate the gasket over the dowel sleeves.
- Using an engine lifting crane, lower the cylinder head onto the engine.
- Lightly lubricate the under side of bolt head and on threads, with engine oil and install. Using the sequence shown in illustration, tighten bolts in the following steps:
- Step 1 Tighten the bolts to 70 N.m (52 ft. lbs.).
- Step 2 Back off 360° in sequence.
- Step 3 Tighten the bolts to 105 N.m (77 ft. lbs.).
- Step 4 Re-check all bolts to 105 N.m (77 ft. lbs.).
- Step 5 Tighten all the bolts an additional 1/4 turn (90°).
Install the fuel injectors. Refer to INSTALLATION .
NOTE:The cowl panel provided access holes to allow the installation of the cylinder 5 exhaust and cylinder 6 intake and exhaust push rods. Install the rubber plugs in the access holes.
- Install the push rods (1) into their original locations. Verify that they are seated in the tappets
.
- Lubricate the valve stem tips and install the crossheads (4) in their original locations.
- Lubricate the rocker arms (2) and pedestals (3) and install them in their original locations. Install the bolts (1) and tighten to 36 N.m (27 ft. lbs.).
- Adjust the intake and exhaust valve lash on cylinders 4, 5, and 6. Refer to STANDARD PROCEDURE .
- Install the rocker housing and cylinder head cover. Refer to COVER(S), CYLINDER HEAD, INSTALLATION, 6.7L . CAUTION:
Failure to follow procedure will result in fuel leaks or fuel system failure.
- Install the fuel rail. Refer to RAIL, FUEL, INSTALLATION .
- Install the air intake heater wire harness. Tighten the nut to 10 N.m (89 in. lbs.).
- Install the air intake heater wire to front of cylinder head. Tighten the three bolts to 24 N.m (18 ft. lbs.).
- Install the intake manifold. Refer to INSTALLATION .
- Install the fasteners securing the oil dip stick tube. Tighten the fasteners to:
- Tighten the bolt to 24 N.m (18 ft. lbs.).
- Tighten the nut to 9 N.m (80 in. lbs.).
- Connect the Engine Coolant Temperature (ECT) sensor connector (1).
- If equipped, install the ECT sensor shield (1). Tighten the bolts (2) to 9 N.m (80 in. lbs.).
- Connect the TMAP sensor wire harness connector (3).
- Install the Charge Air Cooler-to-air inlet housing tube. Tighten all clamps to 11 N.m (8 ft. lbs.).
- Connect the upper radiator hose to thermostat housing.
- Install the generator. Refer to GENERATOR, INSTALLATION .
- Install fan shroud support brackets and tighten to 32 N.m (24 ft. lbs.).
- Install cooling fan/drive/shroud assembly. Refer to FAN, COOLING, VISCOUS, INSTALLATION .
- Connect the heater core supply and return hoses to the cylinder head and heater pipe.
- Install the exhaust manifold. Refer to INSTALLATION .
- Connect both negative battery cables.
- Fill engine coolant. Refer to STANDARD PROCEDURE .
- Start engine and check for leaks.