LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 C, RWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1576 (6.7L Engine (Service Information) - 2500 Hd) >> Manifolds >> Manifold, Intake >> Installation

Manifold, Intake: Installation

WARNING: This page is about a different car, the 2017 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
GC0108834Courtesy of CHRYSLER GROUP, LLC
  1. Clean all gasket mating surfaces.
  2. Using a NEW  gasket (7), install the intake manifold (2). Tighten the bolts (1) to 24 N.m (18 ft. lbs.).
  3. Install the bolt securing the oil dip stick tube-to-intake manifold and tighten to 24 N.m (18 ft. lbs.).
    GC0157553Courtesy of CHRYSLER GROUP, LLC
  4. Connect the EGR valve wire harness connector (1).
    GC0155380Courtesy of CHRYSLER GROUP, LLC
  5. Connect EGR air flow control valve wire harness connector (2).
  6. Install the Charge Air Cooler (CAC) hose (3) to the EGR air flow control valve. Tighten the clamp (1) to 14 N.m (10 ft. lbs.).
    GC0169678Courtesy of CHRYSLER GROUP, LLC
  7. Install the EGR airflow control valve shield (2). Tighten the bolt (3) and nut (1) to 10 N.m (89 in. lbs.).
    GC0169643Courtesy of CHRYSLER GROUP, LLC
  8. Attach the wire harness retainers (1) to the stud.
  9. Install the EGR crossover tube. Refer to TUBE, EXHAUST GAS RECIRCULATION (EGR), CROSSOVER, INSTALLATION .
  10. Connect both negative battery cables.