LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2011 >> 300 Base, Gas >> Repair and Diagnosis >> External Pages >> Different car >> Section 1912 (6.7L Diesel - DTCS P24B4-00 To U3017-00 - 2500HD & 3500HD) >> DTC Troubleshooting >> P24B5-00-Particulate Matter Sensor Heater Control Circuit Low >> Diagnostic Test

Diagnostic Test

WARNING: This page is about a different car, the 2019 RAM 3500 HD and 2019 RAM 2500 HD. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK FOR ACTIVE DTC 
    NOTE:

    If DTCs P24D0, P24AE, U04A4, or U02A3 are present, perform the diagnostics for those DTCs before continuing with this one.

    1. Ignition on, engine not running.
    2. Using the scan tool, read DTCs.

      Is this DTC active?

      Yes 

      • Go To  2

      No 

  2. CHECK SYSTEM VOLTAGE 
    1. Check the Batteries and charging system for proper system voltage and operation.

      Is the system voltage normal?

      Yes 

      • Go To  3

      No 

      • Diagnose and repair the Batteries and charging system before continuing.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
  3. CHECK THE PM SENSOR POWER AND GROUND CIRCUITS 
    1. Turn the ignition on, engine not running.
    2. Disconnect the PM Sensor harness connector.
    3. Measure the voltage across the SCR Relay 2 (F205) Output circuit and the (Z915) Ground circuit at the PM Sensor harness connector.

      Does the voltage read within 1.0 volt of Battery voltage?

      Yes 

      No 

      • Go To  4
  4. CHECK THE SCR RELAY 2 (F205) OUTPUT CIRCUIT FOR A SHORT TO GROUND 
    1. Turn the ignition off.
    2. Disconnect the PCM C2 harness connector.
    3. Measure for continuity between ground and the SCR Relay 2 (F205) Output circuit at the PM Sensor harness connector.

      Is there continuity between ground and the SCR Relay 2 (F205) Output circuit?

      Yes 

      • Repair the SCR Relay 2 (F205) Output circuit for a short to ground.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Repair the SCR Relay 2 (F205) Output circuit for an open/high resistance.
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .