LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 75 (1.6L SOHC Engine) >> Pump-Oil >> Installation

Section 75 (1.6L SOHC Engine): Pump-Oil: Installation

WARNING: This page is about a different car, the 2006 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Locating Timing Chain Cover Seals & Oil Pump
GC0021544Courtesy of DAIMLERCHRYSLER CORP.
1 - TIMING CHAIN COVER SEALS
2 - OIL PUMP
3 - PRESSURE RELIEF VALVE
  1. Install oil pump assembly (2). Start bolts by hand.
    Fig 2: OIL PUMP ASSEMBLY TORQUE SEQUENCE
    GC0042442Courtesy of DAIMLERCHRYSLER CORP.
  2. Torque bolts to 13 N.m (118 in. lbs.) in the sequence above. See Fig 2.
    Fig 3: Timing Chain Cover
    GC0021562Courtesy of DAIMLERCHRYSLER CORP.
    1 - FRONT CRANKSHAFT OIL SEAL
    2 - TIMING CHAIN COVER
  3. Install timing chain cover (2) (Refer to ENGINE/VALVE TIMING/TIMING CHAIN COVER - INSTALLATION)  .