LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 15 (2.7L Engine (Service Information)) >> Windage Tray >> Installation

Windage Tray: Installation

WARNING: This page is about a different car, the 2006 Dodge Magnum, 2006 Dodge Charger, and 2006 Chrysler 300. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Windage Tray
GC0015320Courtesy of DAIMLERCHRYSLER CORP.
NOTE: Slots in windage tray should be on the right side of engine. If windage tray is improperly installed, damage to oil pan could result.
  1. Install windage tray (1) torque mounting bolts to 27 N.m + 1/4 turn (20 Ft. Lbs. +1/4 turn).
  2. Install oil pump pick up tube, torque mounting bolts to 28 N.m (250 In. Lbs.).
    Fig 2: Locating Engine Mount Bolts, Drain Plug And Filter
    GC0015226Courtesy of DAIMLERCHRYSLER CORP.
  3. Install oil pan, refer to ENGINE/LUBRICATION/OIL PAN - INSTALLATION .
  4. Install oil filter (3).
    Fig 3: Lower Splash Shield
    GC0015233Courtesy of DAIMLERCHRYSLER CORP.
  5. Install lower splash shield (2) and retaining bolts (1).
  6. Lower vehicle.
  7. Fill with correct grade of oil.
    Fig 4: Locating Battery
    GC0015222Courtesy of DAIMLERCHRYSLER CORP.
  8. Connect negative battery (1) cable located in trunk.
  9. Start engine and check for leaks.