LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2009 >> 300 Signature Series >> Repair and Diagnosis >> External Pages >> Different car >> Section 133 (Power Top & Sunroof) >> Motor/Module - Sunroof >> Standard Procedure >> Standard Procedure - Power Sunroof Timing

Standard Procedure - Power Sunroof Timing

WARNING: This page is about a different car, the 2006 Chrysler PT Cruiser. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Perform the timing procedures if any of the following conditions exist:
NOTE: The timing of the motor/module and the sunroof assembly play a critical role in the proper function of the sunroof. If the motor/module is removed and the sunroof glass or cables are moved the sunroof module will have to be timed. REFER to the following procedure for the necessary steps.
  1. Perform the motor/module re-initialization procedure, (Refer to ELECTRICAL/POWER TOP/MOTOR - STANDARD PROCEDURE) .
  2. Remove the motor/module, (Refer to ELECTRICAL/POWER TOP/MOTOR - REMOVAL) .
  3. Remove sunroof glass panel (Refer to BODY/SUNROOF/GLASS PANEL - REMOVAL) .
  4. Now place both right and left arms in the closed position. Using a screwdriver, push the plastic cable all the way forward in the track until the glass mounting arm drops into the closed position.
  5. Repeat this on the other side.
  6. To verify correct timing, there is an 1/8 inch hole in the cable ramp that must be aligned with the front glass mounting screw hole.
  7. Using an awl, verify alignment of both right and left timing holes. The tracks will now be timed to the fully closed position.
  8. Install the motor/module (Refer to ELECTRICAL/POWER TOP/MOTOR - INSTALLATION) .
  9. Install the sunroof glass panel, (Refer to BODY/SUNROOF/GLASS PANEL - INSTALLATION) .
  10. Perform the motor/module re-initialization procedure, (Refer to ELECTRICAL/POWER TOP/MOTOR - STANDARD PROCEDURE) .