Diagnostic Test
- 1) A/C CLUTCH OPERATION
Ignition on, engine not running.
With a scan tool in the Powertrain Actuators, actuate the A/C Clutch
Is the A/C Clutch operating?
Yes
- Refer to the INTERMITTENT CONDITION diagnostic procedure.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
No
- Go To 2).
- 2) A/C CLUTCH CONTROL OPERATION FROM THE PCM
Turn the ignition off.
Disconnect the TIPM C1 harness connector.
Turn the ignition on.
Using the scan tool in the Powertrain Actuators, actuate the A/C Clutch
With a 12-volt test light connected to ground, probe the A/C Clutch Control circuit in the TIPM C1 harness connector.
Does the test light illuminate brightly and flash on and off?
Yes
- If OK, replace the TIPM in accordance with the Service Information.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
NOTE: Before continuing, check the TIPM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.No
- Go To 3).
- 3) (C28) A/C CLUTCH CONTROL CIRCUIT SHORTED TO BATTERY VOLTAGE
Stop the A/C Clutch actuation.
Turn the ignition off.
Disconnect the PCM C3 harness connector.
Turn the ignition on.
Measure the voltage of the (C28) A/C Clutch Control circuit at the TIPM C1 harness connector.
Does the voltmeter indicate voltage present?
Yes
- Repair the short to voltage in the (C28) A/C Clutch Relay Control circuit.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
No
- Go To 4).
- 4) (C28) A/C CLUTCH CONTROL CIRCUIT OPEN
Turn the ignition off.
CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.Measure the resistance of the (C28) A/C Clutch Control circuit from the TIPM harness connector to the appropriate terminal of special tool #8815.
Is the resistance below 5.0 ohms?
Yes
- Go To 5).
No
- Repair the open in the (C28) A/C Clutch Control circuit.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
- 5) (C28) A/C CLUTCH CONTROL CIRCUIT SHORTED TO GROUND
Courtesy of DAIMLERCHRYSLER CORP.
Measure the resistance between ground and the (C28) A/C Clutch Control circuit in the TIPM C1 harness connector.
Is the resistance below 100 ohms?
Yes
- Repair the short to ground in the (C28) A/C Clutch Control circuit.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
No
- Go To 6).
- 6) PCM NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.
Were there any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .
No
- Replace and program the Powertrain Control Module in accordance with the Service Information. Refer to MODULE-POWERTRAIN CONTROL and STANDARD PROCEDURE - PCM/ECM/SKREEM PROGRAMMING .
- Perform the POWERTRAIN VERIFICATION TEST. (Refer to STANDARD PROCEDURE - POWERTRAIN VERIFICATION TEST) .