LEMON Manuals: Even more car manuals for everyone
Home >> Chrysler >> 2001 >> Sebring LX, 2D Convertible >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.7L V6 Engine - VIN U >> Valve Timing >> Timing Belt/Chain Cover(S) >> Removal & Installation >> Removal

Removal & Installation: Removal

  1. Disconnect negative battery cable.
  2. Drain cooling system.
  3. Remove coolant pressure container.
  4. Raise vehicle on hoist.
  5. Remove right front wheel and belt splash shield.
  6. Remove accessory drive belts.
  7. Remove crankshaft vibration damper.
  8. Remove AC/Generator belt tensioner/bracket assembly.
  9. Disconnect heater hose from tube at right front frame rail area.
  10. Lower vehicle.
  11. Remove screws securing heater supply tube to right frame rail. Reposition heater supply tube.
  12. Place a floor jack with wooden block under oil pan to support engine.
  13. Remove right engine mount. See REMOVAL .
  14. Remove upper timing chain cover bolts.
  15. Raise vehicle on hoist.
  16. Remove remaining bolts securing timing chain cover to engine.
    Fig 1: Removing Timing Chain Covers
    G00386010Courtesy of CHRYSLER CORP.
  17. Remove timing chain cover.
  18. Discard timing chain cover gasket. Remove front crankshaft oil seal from cover.