Installation Procedure
- NOTE:
Observe the identification and alignment marks on the vacuum hose end (1). These marks indicate which end matches the turbocharger (TC); and alignment of the vacuum hose at the turbocharger housing (2).
Positive Crankcase Ventilation Vacuum Hose (3) @ Compressor Air Intake Turbocharger - Install NEW
- NOTE:
The hose clamps come loosely installed on the NEW positive crankcase ventilation vacuum hose. The hose clamps can be re-positioned when necessary.
Observe the orientation of the hose clamp and ensure the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer will have sufficient room to engage and rotate to secure the hose clamp.
- Install EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer handle (3) onto the NEW positive crankcase ventilation vacuum hose clamp (1).
- Install EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer ratchet (2) into the handle (3), and engaging the hose clamp (1).
- Press down on the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer thumb lever (4) to lock and engage the ratchet (2).
- NOTE:
The hose clamp is properly tightened when the ratchet becomes more difficult to turn, and the hose clamp band compresses flush with the positive crankcase ventilation vacuum hose.
Holding the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer (1) steady with one hand, use the ratchet (2) to tighten the positive crankcase ventilation vacuum hose clamp.
Once the positive crankcase ventilation vacuum hose clamp is suitably tightened, rotate the entire EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer (1) upwards, approximately 90 degrees.
- Holding the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer upward, rotate the bottom lever (2) downwards to cut the excess clamp band.
- Using a suitable tool, bend the hose clamp band backward and down against the hose clamp.
Turbocharger (2) - Install
- Turbocharger Nut (1) - Install NEW - Do NOT tighten. [4x]
-
CAUTION:CAUTION:
Turbocharger Nut (1) - Tighten in sequence [4x]
- First Pass: 15 N.m (11 lb ft)
- Second Pass: 20 N.m (15 lb ft)
- Final Pass: 60 degrees - Use the EN-45059-A Angle Meter
Turbocharger Oil Feed Pipe - Install - Turbocharger Oil Feed Pipe Replacement
Turbocharger Oil Return Pipe - Install - Turbocharger Oil Return Pipe Replacement
- Turbocharger Coolant Feed Pipe - Install - Turbocharger Coolant Feed Pipe Replacement (LIH)
Turbocharger Coolant Return Pipe - Install - Turbocharger Coolant Return Pipe Replacement (LIH)
Turbocharger Wastegate Actuator Vacuum Tank Solenoid Valve Tube - Install - Turbocharger Wastegate Actuator Vacuum Tank Solenoid Valve Tube Replacement
Turbocharger Wastegate Actuator Vacuum Control Solenoid Valve Hose - Install - Turbocharger Wastegate Actuator Vacuum Control Solenoid Valve Hose Replacement
- NOTE:
Observe the identification and alignment marks on the vacuum hose end (3). These marks indicate which end matches the camshaft cover (ENG); and alignment of the vacuum hose at the camshaft cover (1).
Positive Crankcase Ventilation Vacuum Hose (2) @ Camshaft Cover - Install
- NOTE:
The hose clamps come loosely installed on the NEW positive crankcase ventilation vacuum hose. The hose clamps can be re-positioned when necessary.
Observe the orientation of the hose clamp and ensure the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer will have sufficient room to engage and rotate to secure the hose clamp.
- Install EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer handle (3) onto the NEW positive crankcase ventilation vacuum hose clamp (1).
- Install EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer ratchet (2) into the handle (3), and engaging the hose clamp (1).
- Press down on the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer thumb lever (4) to lock and engage the ratchet (2).
- NOTE:
The hose clamp is properly tightened when the ratchet becomes more difficult to turn, and the hose clamp band compresses flush with the positive crankcase ventilation vacuum hose.
Holding the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer (1) steady with one hand, use the ratchet (2) to tighten the positive crankcase ventilation vacuum hose clamp.
Once the positive crankcase ventilation vacuum hose clamp is suitably tightened, rotate the entire EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer (1) upwards, approximately 90 degrees.
- Holding the EN-52875 Positive Crankcase Ventilation (PCV) Hose Clamp Installer upward, rotate the bottom lever (2) downwards to cut the excess clamp band.
- Using a suitable tool, bend the hose clamp band backward and down against the hose clamp.
- Air Cleaner Outlet Rear Duct - Install - Air Cleaner Outlet Rear Duct Replacement
- Charge Air Cooler Inlet Air Hose - Install - Charge Air Cooler Inlet Air Hose Replacement
Warm Up Three-Way Catalytic Converter - Install - Warm Up Three-Way Catalytic Converter Replacement (LIH)
- Perform the intake system learned values reset. Intake System Learned Values Reset
The cut edges of the hose clamp band may be sharp. Observe the end of the hose clamp band. Cut additional band if too much excess band still remains.
The cut edges of the hose clamp band may be sharp. Observe the end of the hose clamp band. Cut additional band if too much excess band still remains.