LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2020 >> Express 2500 LS, 6.0L Eng VIN G >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 9 (Engine Mechanical - 2.8L (LWN) Diesel) >> Repair Instructions >> Upper Oil Pan Cleaning and Inspection >> Assemble

Upper Oil Pan Cleaning and Inspection: Assemble

WARNING: This page is about a different variant/trim than selected.
  1. GM2563450Courtesy of GENERAL MOTORS COMPANY

    Install the oil pump suction pipe (2).

  2. Install the oil pump suction pipe bolts (1). Tighten to 15 N.m (11 lb ft).
  3. GM4424525Courtesy of GENERAL MOTORS COMPANY

    Install the oil level switch spacers [2x] (4) and the oil level switch (2).

  4. Install the oil level switch bolts [2x] (1). Tighten to 9 N.m (80 lb in).
  5. Install the oil level switch retainer (3).