LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2020 >> Express 2500 LS, 6.0L Eng VIN G >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 9 (Engine Mechanical - 2.8L (LWN) Diesel) >> Repair Instructions >> Engine Mount Replacement - Right Side >> Installation Procedure

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
  1. Engine Mount - Install
  2. Lower the engine.
  3. GM4920177Courtesy of GENERAL MOTORS COMPANY
    NOTE:

    For ease of installation, hand start all engine mount fasteners prior to tightening.

    CAUTION:

    Refer to Fastener Caution .

    Engine Mount Bolt (1) @ Frame - Install and tighten [3x] 70 N.m (52 lb ft)

  4. GM4920113Courtesy of GENERAL MOTORS COMPANY

    Engine Mount Bolt (1) @ Engine Block - Install and tighten [3x] 100 N.m (74 lb ft)

  5. Lower and remove the jack.
  6. GM4874591Courtesy of GENERAL MOTORS COMPANY

    Oil Pan Deadener (2) - Install

  7. NOTE:

    Engine front crossmember removed for clarity.

  8. Oil Pan Deadener Bolt (1) - Install and tighten[5x]10 N.m (89 lb in)
  9. Turbocharger - Install - Compressor Air Intake Turbocharger Replacement