3rd - 4th/5th - 6th Synchronizer Installation
WARNING: This page is about a different variant/trim than selected.
NOTE:
Callouts in the following chart represent components shown in graphic above.
3rd - 4th/5th - 6th Synchronizer Installation
| Callout | Component Name |
|---|---|
| 1 | Main Shaft Retaining Ring |
| 2 | 5th Gear Blocking Ring Assembly
NOTE:
Ensure the tabs on the blocking ring align with the corresponding pockets in the synchronizer hub. |
| 3 | 3rd-4th/5th-6th Gear Synchronizer Hub Assembly
NOTE:
Check the 3rd/4th synchronizer assembly scribe marks for correct position. The scribe "3.R.D." must face rear. |