Installation Procedure
WARNING: This page is about a different car, the 2017 Chevrolet Spark. However, it is still accessible from the selected car via links, so may be relevant.
- Install the throttle body assembly (2) to the intake manifold and tighten to 8.5 N.m (75 lb in).
CAUTION: Refer to Fastener Caution .
- Install the fuel injector fuel rail assembly (4) to the intake manifold and tighten to 9 N.m (80 lb in).
- Install the evaporative emission canister purge tube (5).
- Install the intake manifold gasket (4).
NOTE: Use a NEW gasket. Ensure the mating surfaces are clean and free of debris.
- Install the intake manifold (3) with throttle body assembly (1) and fuel injector fuel rail assembly (2) to the engine.
- Install the camshaft cover. Refer to Camshaft Cover Installation (LV7) .
- Install the intake manifold (2).
- Install the intake manifold bolts (1) and tighten the bolts in sequence in two steps final torque. Tighten to 10 N.m (89 lb in).
- Connect the fuel feed line quick connect fitting from the fuel rail.
- Install the manifold absolute pressure sensor. Refer to Manifold Absolute Pressure Sensor Replacement (LV7) .
- Connect the electrical connectors.
- Install the air cleaner outlet duct. Refer to Air Cleaner Outlet Duct Replacement (LV7) .
- Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
- Close the hood.