LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2018 >> Spark LT, Automatic CVT Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 55 (Manual Transmission - Y4A/Y4M (MR7)) >> Repair Instructions - Off Vehicle >> Shift Shaft and Fork Assemblies Assemble >> 1st-2nd Gear Shift Shaft Assembly

1st-2nd Gear Shift Shaft Assembly

WARNING: This page is about a different car, the 2017 Chevrolet Spark. However, it is still accessible from the selected car via links, so may be relevant.
  1. Place the shift shaft into a vise with a protector.
    Fig 1: 1st-2nd Gear Shift Shaft Assembly Components
    GM2493600Courtesy of GENERAL MOTORS COMPANY
  2. Install the 1st-2nd gear shift fork (4).
  3. Install the new 1st-2nd gear shift fork pin (3) using a pin punch and a hammer.
  4. Install the 1st-2nd gear shift yoke (2).
  5. Install the new 1st-2nd gear shift yoke pin (1) using a pin punch and a hammer.
  6. Install the 1st-2nd gear shift shaft assembly into the gear unit.
  7. Install the gear unit. Refer to Transmission Assemble .