LEMON Manuals: Even more car manuals for everyone
Home >> Chevrolet >> 2018 >> Spark LT, Automatic CVT Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 24 (Engine Controls And Fuel - 1.4L (LV7) - Repair Instructions) >> Repair Instructions >> Evaporative Emission Pipe Replacement (LV7) >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2017 Chevrolet Spark. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the evaporative emission pipe (3) to the vehicle.
    Fig 1: Right Side Of Underbody Rear Air Deflector
    GM4174489Courtesy of GENERAL MOTORS COMPANY
  2. Install the evaporative emission pipe (3) to the retainers (2).
  3. Connect the evaporative emission pipe fitting (2) to the evaporative emission canister purge pipe. Refer to Plastic Collar Quick Connect Fitting Service .
  4. Install the right side of underbody rear air deflector (1). Refer to Underbody Rear Air Deflector Replacement .
  5. Install the evaporative emission pipe (1) to the retainers (2).
    Fig 2: Evaporative Emission Pipe And Retainers
    GM4174485Courtesy of GENERAL MOTORS COMPANY
  6. Install the front bumper fascia upper molding. Refer to Front Bumper Fascia Upper Molding Replacement (Left Side)Front Bumper Fascia Upper Molding Replacement (Right Side)
  7. Lower the vehicle.
  8. Install the evaporative emission pipe (2) to the retainer (3).
    Fig 3: Evaporative Emission Pipe And Retainer
    GM4174481Courtesy of GENERAL MOTORS COMPANY
  9. Install the evaporative emission pipe fitting (1) to the fuel rail. Refer to Plastic Collar Quick Connect Fitting Service .