Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the intake manifold gasket.
- Install the intake manifold.
- Install the intake manifold nuts and bolts.
Tighten: Tighten the intake manifold nuts and bolts to 10 N.m (89 lb in).
- Install the coolant hoses to the intake manifold.
Tighten: Tighten the hose clamps to 17 N.m (13 lb ft).
- Connect the electrical connector to the intake manifold.
- Install the oil level indicator tube and bolt.
Tighten: Tighten the oil level indicator tube bolt to 10 N.m (89 lb in).
- Reposition the AC compressor and install the bolts.
Tighten: Tighten the bolts to 22 N.m (16 lb ft).
- Install the cooling fan assembly. Refer to Fan Shroud Replacement in Engine Cooling.
- Install the charged air coolant pump. Refer to Coolant Pump Replacement - Charge Air Cooler in Engine Cooling.
- Install the generator. Refer to Generator Replacement (RPO LSJ) in Engine Electrical.
- Connect the charged air cooling system inlet and outlet hoses.
- Fill the charged air cooling system. Refer to Draining and Filling Cooling System - Charge Air Cooling System in Engine Cooling.
- Install the supercharger. Refer to Supercharger Replacement .
NOTE:
Refer to Fastener Notice
in Cautions and Notices.