Installation Procedure
WARNING: This page is about a different car, the 2007 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
- Install the transmission mount in the side rail.
Tighten: Tighten the transmission mount to side rail bolts to 37 N.m (27 lb ft).
- Use the floor jack to raise the powertrain into position.
- Align both side mounts with the surfaces flush with the mount brackets.
- Align all the bolt holes in both side mounts and hand tighten both upper mount bolts, three per side.
- Tighten the mount bolts starting with the center ones.
Tighten: Tighten both upper mount bolts to 50 N.m (37 lb ft).
- Raise the vehicle.
- Install the rear mount through bolt. Hand tighten only.
- Install the front mount through bolt. Hand tighten only.
- Perform the powertrain mount balance procedure. Refer to Powertrain Mount Balance - Total Mounts .
- Remove the floor jack and block of wood.
- Install the battery tray. Refer to Exhaust Manifold Pipe Replacement (3.5L (L66)) .
NOTE:
Refer to Fastener Notice
.
IMPORTANT:
Hand start all bolts before tightening.