Oil Pan Installation
| Callout | Component Name |
|---|---|
| 1 | Upper Oil Pan
NOTE:
Install and align the oil pan within 10 minutes of applying the sealer. Procedure
|
| 2 | Upper Oil Pan Bolt Procedure Tighten the upper oil pan bolts in the sequence shown.
CAUTION:
Refer to Fastener Caution . Tighten 12 N.m (106 lb in) |
| 3 | Upper Oil Pan Bolt Procedure Tighten the upper oil pan bolts in the sequence shown. Tighten 25 N.m (18 lb ft) |