Repair Procedures
WARNING: This page is about a different variant/trim than selected.
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.
- Control Module References for PIM and APM replacement, setup, and programming.
- Drive Motor Battery Positive and Negative Cable Replacement
- Air Conditioning Compressor Replacement (HP2)
- Generator Control Module 3-Phase Cable Assembly Replacement
- Drive Motor with Generator Assembly Removal - 1st Position
- Drive Motor with Generator Assembly Removal - 2nd Position