Installation Procedure
WARNING: This page is about a different car, the 2006 Pontiac Montana SV6, 2006 Chevrolet Uplander, and 2006 Buick Terraza. However, it is still accessible from the selected car via links, so may be relevant.
- Install the cooling fan shroud and fans.
- Connect the TOC lines to the fan shroud retainer clip.
- Connect the upper TOC line to the radiator. Refer to Transmission Fluid Cooler Line Quick Connect Fitting in Automatic Transaxle - 4T65-E.
- Install the cooling fan shroud bolts.
Tighten: Tighten the bolts to 6 N.m (53 lb in).
- Install the radiator upper mounts.
- Install the radiator upper mount bolts.
Tighten: Tighten the bolts to 10 N.m (88 lb in).
- Install the battery. See Engine Electrical.
- Position the hose. Install the overflow hose to the retainers.
- Install the hose (1) to the reservoir.
- Position the coolant overflow hose clamp at the coolant recovery reservoir.
- Position the engine mount struts brackets flush with the upper radiator support.
- Install the engine mount strut bracket brace bolts to the upper radiator support.
Tighten: Tighten bolts to 28 N.m (21 lb ft).
- Tighten the engine strut mount nuts at the engine side.
Tighten: Tighten the nuts to 48 N.m (35 lb ft).
- Connect the cooling fan harness electrical connector.
- Install the radiator inlet hose. Refer to Radiator Hose Replacement - Inlet .
- Install right side diagonal brace. Refer to Brace Replacement - Sheet Metal Diagonal (Chevrolet) or Brace Replacement - Sheet Metal Diagonal (Pontiac) or Brace Replacement - Sheet Metal Diagonal (Buick) in Body Front End.
- Install the air cleaner and duct assembly. Refer to Air Cleaner Assembly Replacement in Engine Controls - 3.5L (LX9).
NOTE:
Refer to Fastener Notice
in Cautions and Notices.