Installing the clean air pipe of cylinder bank 1
- Check the sealing ring of the clean air pipe (1) for damage, replace if necessary.
- Position and install the clean air pipe of cylinder bank 1.
The retaining clip must engage audibly.
Follow-up work
- Refer to FASTENING THE ENGINE VENTILATION LINE OF CYLINDER BANK 1 .
- Refer to INSTALLING RIGHT INTAKE SILENCER HOUSING .
- Refer to INSTALLING ACOUSTIC COVER .