Installing wiring harness section for ignition system of bank 2
- Feed in wiring harness section and position.
- Engage wiring harness section in holders (4).
- Engage wiring harness section with holder (1).
- Tighten nut (3).
TIGHTENING TORQUES SPECIFICATION
| Ground cable to hold-down device | ||
| Nuts | Tightening torque | 5.5 Nm |
- Tighten down screw (2).
TIGHTENING TORQUES SPECIFICATION
| Cable duct | ||
| M6x16 screw | Tightening torque | 10 Nm |
- Tighten nut (3).
TIGHTENING TORQUES SPECIFICATION
| Ground cable to hold-down device | ||
| Nuts | Tightening torque | 5.5 Nm |
- Tighten down screw (2).
TIGHTENING TORQUES SPECIFICATION
| Cable duct | ||
| M6x16 screw | Tightening torque | 10 Nm |
- Engage wiring harness section in marked areas (1).
Follow-up work
- Refer to CONNECTING THE CONNECTOR OF THE IGNITION COIL OF CYLINDER BANK 2 .
- Refer to CONNECTING THE CONNECTOR OF THE INJECTORS OF CYLINDER BANK 2 .
- Refer to INSTALLING COOLANT EXPANSION TANK .
- Refer to INSTALLING HOLDER OF THE DME CONTROL UNIT FOR CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE COVER PANEL OF THE SLAVE DME CONTROL UNIT .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to CONNECTING BATTERY GROUND LEAD .