Install the engine ventilation line of cylinder bank 2
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Insert and position the engine ventilation line (2).
- Tighten down screws (1).
TIGHTENING TORQUE SPECIFICATIONS
| Engine ventilation line | ||
|---|---|---|
| screw | Tightening torque | 9.3 Nm |
- Position engine ventilation line (2).
- Connect and lock retaining clip (1).
Follow-up work
- Refer to INSTALLING THE TANK VENTILATION LINE OF CYLINDER BANK 2 PARTIALLY .
- Refer to INSTALLING THE RETAINING BRIDGE IN AN EQUIPMENT SPECIFICATION WITH A GASOLINE PARTICULATE FILTER .
- Installing conduit on bank 2.
- Clip the wiring harness (2) into the clamps (1).
- Installing cable duct at cylinder bank 1.
- Position the conduit (2).
- Tighten the screws (1).
TIGHTENING TORQUESCable duct M6x16 screw Tightening torque 10Nm - Refer to INSTALLING (PARTIAL INSTALLATION) THE EXPANSION TANK FOR THE CHARGE AIR COOLERS .
- Refer to INSTALLING COOLANT EXPANSION TANK .
- Refer to INSTALLING HOLDER OF THE DME CONTROL UNIT FOR CYLINDERS 5 TO 8 .
- Refer to ATTACHING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 5 TO 8 .
- Refer to ATTACHING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 1 TO 4 .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE COVER PANEL OF THE SLAVE DME CONTROL UNIT .
- Refer to INSTALLING THE COVER PANEL OF THE MASTER DME CONTROL UNIT .