LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2019 >> X6 M >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel System -- Repair X6 M (F86) >> 13 51 Injection Pump, Regulating Parts, Mixture Control >> Remove/install/replace left high pressure pump (N63 B40/B44 O 1, S63 B44 T 2) (X6 M)

Remove/install/replace left high pressure pump (N63 B40/B44 O 1, S63 B44 T 2) (X6 M)

Special tools required: 

WARNING: Observe WARNING  on cylinder head cover.
Disconnect NEGATIVE BATTERY TERMINAL(risk of fire due to short-circuiting on dismantling). 
Electric fuel pump starts up automatically when door is opened! 
Carry out installation work on fuel system only with coolant temperature below 40°C.
CAUTION: Wear full face guard and protective gloves.
Fuel can emerge spontaneously at high speed when the high pressure line is released! 
CAUTION: Adhere to conditions of absolute cleanliness when working on the high-pressure fuel system.
Introduced contaminants can cause malfunctions in the system! 
CAUTION: Ignition coils must not be fouled by fuel.
The resistance of the silicone material is reduced significantly by contact with fuel, which may cause the ignition coil to fail! 
Cover ignition coil with suitable means.

Necessary preliminary work: 

Recycling: 

Fuel escapes when fuel lines are detached.

Catch and dispose of escaping fuel.

Observe country-specific waste disposal regulations.

Release screws (1) and (2).

G09875714Courtesy of BMW OF NORTH AMERICA, INC.

Release pressure line at the injectors (1).

Tighten pressure line on injector with torque wrench and special tool 13 0 161.

Tightening torque 13 53 2AZ .

G09875715Courtesy of BMW OF NORTH AMERICA, INC.

Pull off connector (2) with holder (1) in an upwards direction.

G08494443Courtesy of BMW OF NORTH AMERICA, INC.

Release the union nuts of the fuel delivery line (1) and pressure line (2) at the high pressure pump (3).

G08494440Courtesy of BMW OF NORTH AMERICA, INC.

Installation note: 

Tighten fuel delivery line (1) and pressure line (2) hand-tight at high pressure pump.

Next, tighten the pressure line on the high pressure pump with the torque wrench (2) and a special tool (3) 00 1 440.

Tightening torque: 13 53 3AZ .

G06178956Courtesy of BMW OF NORTH AMERICA, INC.

Release the screws (1) and attach the cable channel (2).

Tightening torque: 12 51 2AZ .

CAUTION: Screw back on all screw points of cable channels without fail. Some screw points are also ground points  .
G09875719Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1) a few rotations and slacken rail.

Tightening torque: 13 53 1AZ .

G09875721Courtesy of BMW OF NORTH AMERICA, INC.

Disconnect fuel delivery line. Seal fuel lines with special tool (1) 13 5 160 and special tool (2) 13 5 162.

Catch and dispose of escaping fuel.

G06178365Courtesy of BMW OF NORTH AMERICA, INC.

Pull off connector (1) from high pressure pump (2).

G08494444Courtesy of BMW OF NORTH AMERICA, INC.
CAUTION: High-pressure pump can be pretensioned by camshaft cams!
Slightly slacken screws (1) of high pressure pump (2). If the high pressure pump is forced out, the engine will have to be turned to bring the camshafts to a different position.
Otherwise it will not be possible to install the high-pressure pump! Release screws (1).
G06178942Courtesy of BMW OF NORTH AMERICA, INC.

Replace screws. Screws are coated with a screw locking agent.
The pump plunger can fall out when the high-pressure pump (2) is pulled out! Detach high-pressure pump (2) and remove.
Engine oil can emerge when pulling off the pump; have cloths ready.

Installation note: 

Before installing the high pressure pump, the cam of the high pressure pump drive must be turned to BDC  . To do this, twist the engine if necessary in the direction of engine rotation to the central bolt of the crankshaft.

Observe screwing sequence! 

  1. Tighten screws (3) on rail. Tightening torque 13 53 1AZ .
  2. Tighten nuts (1) on the injectors. Tightening torque 13 53 2AZ .
  3. Tighten nut (2) on the high pressure pump. Tightening torque 13 53 3AZ .

Lay depth gauge (1) flat on high pressure pump flange.

Turn engine at central bolt in direction of engine rotation until the depth gauge shows that the camshaft has reached the BDC position  .

G09846718Courtesy of BMW OF NORTH AMERICA, INC.

Clean contact surfaces.

Replace seal (1).

Install adapter if necessary, see applicable BMW parts catalogue.

G14240914Courtesy of BMW OF NORTH AMERICA, INC.

Install high pressure pump (2).

Replace screws (1). Screws (1) are coated with sealing compound.

Installation note: 

Provisionally fasten screws (1) on high pressure pump (2) and tighten alternately in 90° increments until final tightening, otherwise the piston may break as a result of tilting!

G06178942Courtesy of BMW OF NORTH AMERICA, INC.

Tightening torque: 13 51 1AZ .

Assemble engine.

Check fuel system for tightness.

Check function of DME.