Removing and installing/replacing charge air duct of cylinder 4-6 (S55 engine)
Necessary preliminary work:
- Remove ACOUSTIC COVER .
- Remove right-hand INTAKE SILENCER HOUSING .
Removal:
Unfasten hose clamp (1).
Release screw (3).
Remove the charge air line (2).
Installation:
Insert and install the charge air line (2).
Installation note:
The gaskets and connections on the charge air pipe must be installed dry and free from grease.
Tighten hose clamp (1).
Tightening torque: 11 61 4AZ .
Tighten screw (3).
Tightening torque: 11 61 3AZ .
Required follow-up work:
- Install right INTAKE FILTER HOUSING .
- Install the ACOUSTIC COVER .