11 00 598 Removing and installing engine on front axle (S63) with GS6-53BZ transmission
Special tools required:
- 11 0 000 .
Necessary preliminary tasks:
- Remove front axle with engine and transmission. See COMPLETELY REMOVING FRONT AXLE WITH ENGINE AND TRANSMISSION (DOUBLE-CLUTCH GEARBOX)or COMPLETELY REMOVING FRONT AXLE WITH ENGINE AND TRANSMISSION (MANUAL GEARBOX) .
Screw fixtures (20) onto table lift at a suitable location.
Move screw adapter (30) with plate (80) up against the transmission oil sump (1).
Disconnect plug connection (1).
Release screw (2).
Tightening torque 13 62 4AZ .
Remove sensor (3).
Disconnect plug connection (1) from oil pump.
Disconnect plug connection (1) from reversing light switch.
Release cable from brackets.
Release screw (1).
Loosen the hydraulic lines (2).
Tightening torque 17 22 1AZ .
Installation note:
Check installed position of hydraulic lines (2).
Replace sealing rings.
Loosen screws (1) with brackets of hydraulic lines.
Tightening torque 17 22 3AZ .
Release and disconnect hydraulic lines (2) from brackets.
Disconnect plug connection (1).
Release bolts (1) and screws (2).
Tightening torque 23 00 1AZ .
Release screws (1).
Tightening torque 23 00 1AZ .
Slightly raise engine with workshop crane and special tool 11 0 000 .
This simplifies removal and installation of transmission.
Recycling:
Capture emerging transmission oil with a suitable drip tray (1).
Disconnect transmission (2) from engine.
Unscrew nuts (1).
Raise engine approx. 10 mm with cross member.
Installation note:
Replace self-locking nuts.
Tightening torque 22 11 2AZ .
Lift engine from front axle with workshop crane and special tool 11 0 000 .
Mount engine on ASSEMBLY STAND .