Surface Preparation
- For better adhesion, remove oxide film and paint from the adhesive areas with a stainless steel wire brush or special sandpaper.
- Clean bonding surfaces with cleaning agent R1.
- Allow cleaned surfaces to dry for approx. 5 minutes.
Bonding surfaces must be completely dry.
- The ridges on the repair elements with a height of approx. 0.5 mm serve to orientate the minimum adhesive thickness. The ridges must not be ground off!