LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 650i 2D Convertible, Automatic >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Engine Electrical System - Repair (N62) >> 42 Starter Lead >> 12 42 500 Removing And Installing Or Replacing Battery Positive Lead (Between Alternator, Starter Motor And Jump Start Connection Point) (N62, N62TU)

12 42 500 Removing And Installing Or Replacing Battery Positive Lead (Between Alternator, Starter Motor And Jump Start Connection Point) (N62, N62TU)

REFERENCE CHART

Work step Note:
Switch off ignition  
Disconnect battery negative lead Follow instructions for disconnecting and connecting battery
Disconnect battery positive lead at jump start connection point Tightening torque: 12 42 1AZ  . See WIRES TO STARTER for specs.
Remove INTAKE AIR MANIFOLD  
Remove FAN COWL  
Detach battery positive lead from alternator  
Release expansion tank  
Secure engine in installation position with special tool  
Release both engine mounts from above  
Lower front axle  
Remove right exhaust manifold  
Remove HEAT SHIELD FROM STARTER MOTOR   
Detach battery positive lead from starter motor Tightening torque: 12 41 4AZ  . See STARTER AND MOUNTING PARTS for specs.
Remove battery positive lead