LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2009 >> 135i 2D Convertible, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Cooling System (Mechanical) >> Cooling System - Repair >> Coolant, Checking Cooling System >> 17 00 039 Venting cooling system and checking for water leaks (N54)

17 00 039 Venting cooling system and checking for water leaks (N54)

WARNING: Danger of scalding!
Open sealing cap only after engine has cooled down.
IMPORTANT: Electric coolant pump!
Follow instructions for  working on cooling system   .
IMPORTANT: Lifetime coolant filling: 
Never reuse used coolant!
When replacing and removing components which rely on the corrosion protection effect of the coolant, it is essential to change the coolant. The cooling system must therefore be drained and refilled.
In the case of other removal work involving the draining of partial quantities of coolant, replace these quantities which have been drained with new coolant.

Only when refilling! 

Use only recommended coolant  .

Observe mixture ratio  .

Perform filling operation slowly.

Adjust coolant level to MAX.

Fig 1: Identifying Coolant Level
G04725836Courtesy of BMW OF NORTH AMERICA, INC.

Close coolant expansion tank.

Installation: 

Close cap (1) until the arrow marks line up.

Fig 2: Identifying Coolant Expansion Tank Cap
G04725828Courtesy of BMW OF NORTH AMERICA, INC.
IMPORTANT: The following venting procedure is necessary e.g. when a part is replaced in the cooling system or when the cooling system is refilled.

Vehicles with independent heating only: 

Open vent screw (1).

Tightening torque 17 00 4AZ, see 17 00 COOLANT .

Slowly fill coolant expansion tank with recommended coolant  .

Close vent screw (1) after coolant emerges.

Installation: 

Have a cleaning cloth ready and mop up emerging coolant.

Fig 3: Identifying Vent Screw
G04725838Courtesy of BMW OF NORTH AMERICA, INC.

Adding coolant: 

NOTE: Open vent screw (1).
Fill coolant expansion tank up to lower edge of filler neck with recommended coolant  .
Observe mixture ratio  .
Close bleed screw (1).
Close cap on expansion tank.

Installation: 

Have a cleaning cloth ready and mop up emerging coolant.

Fig 4: Identifying Bleed Screw
G04751515Courtesy of BMW OF NORTH AMERICA, INC.

Only when venting! 

NOTE: Do not open the coolant expansion tank cap during the venting procedure.
  1. Connect battery charger.
  2. Switch on ignition.
  3. Set heater to maximum temperature and turn fan down to lowest speed.
  4. Press accelerator pedal for 10 seconds to floor. Engine  must not  be started.
  5. The venting procedure is started when the accelerator pedal is pressed and takes approx. 12 minutes. (Electric coolant pump was activated and shuts down automatically after approx. 12 minutes).
  6. Then top up fill level in coolant expansion tank with 100 ml above max.
  7. Check cooling system for leaks   .
  8. If venting has to be carried out again (e.g. if cooling system is leaking), allow DME to fall completely (leave ignition key removed for approx. 3 minutes), then repeat from Point 3.

Only when venting! 

Perform filling operation slowly.

Fill coolant expansion tank with 100 ml above max.

100 ml corresponds to A=6 mm.

Fig 5: Identifying Coolant Expansion Tank Dimension
G04725840Courtesy of BMW OF NORTH AMERICA, INC.

Close coolant expansion tank.

Installation: 

Close cap (1) until the arrow marks line up.

Fig 6: Identifying Coolant Expansion Tank Cap
G04725828Courtesy of BMW OF NORTH AMERICA, INC.