64 11 206 Removing and installing or replacing heater
Necessary preliminary tasks:
- Draw off refrigerant from A/C system, refer to 64 50 009 DRAWING OFF, EVACUATING AND FILLING A/C SYSTEM (R 134A) .
- Remove instrument panel trim, refer to 51 45 030 REMOVING AND INSTALLING INSTRUMENT PANEL TRIM .
- Remove temperature sensor for cold-air distributor, refer to 64 11 916 REPLACING TEMPERATURE SENSOR FOR COLD-AIR DISTRIBUTOR .
- Remove control unit for Car Access System, refer to 61 35 015 REMOVING AND INSTALLING (REPLACING) CONTROL UNIT FOR CAR ACCESS SYSTEM .
- In appropriate version:
- Remove head-up display, refer to 62 30 010 REMOVING AND INSTALLING/REPLACING HEAD-UP DISPLAY .
Unscrew nuts (1).
Installation:
Tightening torque, refer to 64 53 8AZ in HEATING AND AIR CONDITIONING - TIGHTENING TORQUES - 645CI .
Detach refrigerant line (2) in direction of arrow.
Unclip refrigerant line (3).
- When installing heater, make sure left and right air ducts are correctly seated.
- Check left and right air ducts for leaks.
- If necessary, reseal left and right air ducts with butylene tape.
- If left and right air ducts are resealed, make sure air flaps can move freely.
Feed out rubber grommet (1).
Installation:
Make sure rubber grommet (1) is correctly seated.
Release nut (2) and detach refrigerant lines (3) and (4) in direction of arrow.
Installation:
Tightening torque refer to 64 53 7AZ in HEATING AND AIR CONDITIONING - TIGHTENING TORQUES - 645CI .
Replace sealing rings.
Release nuts (5) on right air duct.
Installation:
Tightening torque, refer to 64 11 4AZ in HEATING AND AIR CONDITIONING - TIGHTENING TORQUES - 645CI .
Feed out rubber grommet (1).
Installation:
Make sure rubber grommet (1) is correctly seated.
Release spring clamps (2) and detach coolant hoses (3).
Installation:
Vent cooling system and check for leaks, refer to 17 00 039 VENTING COOLING SYSTEM AND CHECKING FOR LEAKS (N62) .
Release nuts (4) on left air duct.
Installation:
Tightening torque, refer to 64 11 4AZ in HEATING AND AIR CONDITIONING - TIGHTENING TORQUES - 645CI .
Remove soundproofing from left A-pillar (1) in direction of arrow.
Release screws (2).
Remove left air duct (4) in direction of cold-air distributor (3).
Remove soundproofing from right A-pillar (1) in direction of arrow.
Release screws (2).
Remove right air duct (4) in direction of cold-air distributor (3).
Carefully lever out locks (1) and (2).
Detach cold-air distributor (3) in direction of arrow.
Installation:
Make sure cold-air distributor (3) is correctly seated.
Necessary preliminary tasks:
- Disconnect all necessary cable ties on support tube.
- Release wiring harnesses/cable ducts and lay to one side.
- If necessary, remove control units/disconnect plug connections.
Installation:
Make sure wiring harnesses/cable ducts are correctly routed and secured.
If necessary, remove CD changer (1), refer to 65 11 072 REMOVING AND INSTALLING/REPLACING CD CHANGER .
Release screws (2).
Set fuse-carrier (3) down in footwell.
Feed out footwell heater ducts (1) and remove.
Release screws (2), tightening torque, refer to 51 71 15AZ in BODY EQUIPMENT - TIGHTENING TORQUES - 645CI .
Release screws (3), tightening torque, 21.4 N.m.
Release nuts (4), tightening torque, refer to 51 71 15AZ in BODY EQUIPMENT - TIGHTENING TORQUES - 645CI .
Pull back support tube (5) and remove from vehicle with assistance of a second person.
If necessary, unlock and disconnect plug connections on heater (1).
Remove heater (1) in direction of arrow.
Installation:
Make sure heater (1) is correctly seated.
Installation:
Make sure condensate drain (1) is correctly seated in grommet (2) on both sides.