OVERVIEW - Battery -A-, RS Q3, 0K0
- Battery
- Checking. Refer to Battery, Checking .
- Removing and Installing. Refer to Battery -A-, REMOVING AND INSTALLING, RS Q3, 0K0 .
- Bracket
- Bolt
- 20 Nm
- Main Fuse Box
- Overview. Refer to COMPONENT LOCATION OVERVIEW - MAIN FUSE PANEL .
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING, RS Q3, 0K0 .
- Nut: 5 Nm
- Positive Terminal Cover
- Crashpad
- Wire
- For the Battery Monitoring Control Module -J367-
- Follow the sequence when connecting the ground cable. Refer to Connecting .
- Retaining Bracket
- Bolt
- Quantity: 4
- 20 Nm
- Ground Wire
- With Battery Monitoring Control Module -J367-
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING, RS Q3, 0K0 .
- Removing and Installing. Refer to GROUND CABLE WITH Battery Monitoring Control Module -J367-, REMOVING AND INSTALLING, RS Q3 .
- Nut: 5 Nm
- Nut
- 20 Nm
- Battery Cover
- Central Venting System Hose
- With integrated grommet