LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2020 >> SQ8 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 64 (Engine Assembly (6-Cylinder Direct Injection 3.0L 4V TFSI Engine Ea839)) >> 10 Engine Assembly >> SUBFRAME Mount >> Engine, Supporting In Installation Position

Engine, Supporting In Installation Position

WARNING: This page is about a different car, the 2024 Audi SQ5 and 2023 Audi SQ5. However, it is still accessible from the selected car via links, so may be relevant.

Special tools and workshop equipment required 

Procedure

-- Remove the engine cover and heat shield. Refer to ENGINE COVER, REMOVING AND INSTALLING .

-- Remove the left and right covers for the fender. Refer to OVERVIEW - FENDER .

-- Position the :10-222A  at the left and right on the longitudinal member.

GWWA10-11973Courtesy of AUDI

-- Engage the :10-222A/11  at the left and right on the engine lifting eyes.

-- Tension the engine with the spindles slightly until the engine mount is not under a load.

Assembling

Assemble in the reverse order of removal. Note the following:

-- Install the heat shield and engine cover. Refer to ENGINE COVER, REMOVING AND INSTALLING .