OVERVIEW - Battery -A-.
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Audi SQ5, 2024 Audi Q5 e, 2024 Audi Q5, 2023 Audi SQ5, and 2023 Audi Q5 e. However, it is still accessible from the selected car via links, so may be relevant.
- Ground Wire
- With Battery Monitoring Control Module -J367-
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING, 0K0 AND 0K3 .
- Removing and Installing. Refer to GROUND CABLE WITH Battery Monitoring Control Module -J367-, REMOVING AND INSTALLING .
- Grommet
- For the central venting system hose
- Central Venting System Hose
- Nut
- 6 Nm
- Battery
- Checking. Refer to Battery, Checking .
- Removing and Installing. Refer to BATTERY, REMOVING AND INSTALLING .
- Battery cover
- Bolt
- Quantity: 2
- 20 Nm
- Securing Strap
- With battery bracket
- Bolt
- Quantity: 2
- 20 Nm
- Positive Terminal Cover
- Main Fuse Panel
- Overview. Refer to OVERVIEW - MAIN FUSE PANEL .
- Disconnecting and Connecting. Refer to Battery -A-, DISCONNECTING AND CONNECTING, 0K0 AND 0K3 .
- Nut
- 6 Nm
- Bolt
- Quantity: 2
- 20 Nm
- Retaining Bracket
- On the right battery (0K0)
- No retaining bracket installed (0K3)
- Nut
- 20 Nm