LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2020 >> SQ8 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 49 (Battery, Starter, Generator, Cruise Control) >> 27 Battery, Starter, Generator, Cruise Control >> Battery >> Battery, Removing And Installing >> Battery, 48 V -A6-, REMOVING AND INSTALLING, 0K4 AND VH2 >> Installing

Battery, 48 V -A6-, REMOVING AND INSTALLING, 0K4 AND VH2: Installing

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2024 Audi SQ5, 2024 Audi Q5 e, 2024 Audi Q5, 2023 Audi SQ5, and 2023 Audi Q5 e. However, it is still accessible from the selected car via links, so may be relevant.

Install in the reverse order of removal while noting the following:

-- When the ignition and electrical equipment are switched off, connect the battery in the following sequence:

-- First connect the battery positive cable terminal to the battery positive terminal "+" by hand and tighten the nut.

-- Connect the battery ground cable terminal clamp to the battery negative terminal "-" by hand and tighten the nut.

-- Attach the cap until it engages audibly.

-- Connect the connector.

-- Check the battery for secure fit after installation.

-- Connect the Battery -A- and re-energize the 48V system. Refer to Battery -A-, DISCONNECTING AND CONNECTING, 0K4 AND VH2 .

-- If the Battery, 48 V -A6- was replaced, the new Battery, 48 V -A6- must be adapted.

-- Connect the Vehicle Diagnostic Tester.

-- Select the Diagnostic  mode and start the diagnosis.

-- Select the Test plan  tab.

-- Select the Select individual test  button and select the following tree structure consecutively:

-- Start the selected program and follow the instructions on the Vehicle Diagnostic Tester display.

Tightening Specifications