LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2020 >> SQ8 Premium Plus >> Repair and Diagnosis >> External Pages >> Different car >> Section 317 (Air Conditioning (Heating, Ventilation And Air Conditioning) (Refrigerant Circuit)) >> 87 Air Conditioning >> Refrigerant Circuit >> Refrigerant Receiver, Removing And Installing >> Installing

Refrigerant Receiver, Removing And Installing: Installing

WARNING: This page is about a different car, the 2023 Audi SQ8, 2023 Audi RS Q8, and 2023 Audi Q8. However, it is still accessible from the selected car via links, so may be relevant.
GWWA87-12187Courtesy of AUDI OF AMERICA, LLC

Install in the reverse order of removal while noting the following:

-- Replace the O-rings -F and G-. Refer to REFRIGERANT CIRCUIT SEALS and the Parts Information for the correct version.

-- If equipped, check the alignment pin on the heater core -E- and on the refrigerant line -H- for damage and correct seating.

-- Install the refrigerant receiver -D-.

-- Insert the refrigerant line -C- and pay attention to the correct routing.

-- Install the bolts -A and B-.

-- Check the routing after securing refrigerant lines. They must be inserted in their brackets and must not come into contact with other components.

-- Reinstall the rest of the removed components in the reverse order and reattach the loosened components.

-- Evacuate and fill the refrigerant circuit. Refer to Refrigerant Circuit (Refrigerant R134a Servicing, Refrigerant Circuit, Working with A/C Service Station) or Working with A/C Service Station .

-- Switch the ignition on.

-- Initiate the A/C system basic setting through the Thermal Management Control Module -J1024-, and activate the power-controlled valves through the stored routine Charge/flush the refrigerant circuit stop routine  using the Vehicle Diagnostic Tester .

-- Operate the A/C system after charging the refrigerant circuit. Refer to A/C SYSTEM, STARTING AFTER CHARGING REFRIGERANT CIRCUIT .