Check Valve In Refrigerant Line From Refrigerant Receiver, Removing And Installing: Installing
Install in the reverse order of removal while noting the following:
- Pay attention to the flow direction of the check valve -3- (sticker).
-- Replace the O-rings -2-. Refer to REFRIGERANT CIRCUIT SEALS and Parts Information for the version.
-- Check the alignment pin -7- for damage and proper seating.
-- Install the check valve -3- on the correct side. Refer to SYSTEM OVERVIEW - REFRIGERANT CIRCUIT ON VEHICLES WITH HIGH-VOLTAGE SYSTEM AND WITH HEAT PUMP FUNCTION for the flow direction.
-- Install the bolts -5- (with washer -6-) by hand until the stop.
-- Check the refrigerant lines -3 and 4- for correct routing.
-- Install the bolts -5-.
-- Check the routing after securing refrigerant lines. They must be inserted in their brackets and must not come into contact with other components.
-- Reinstall the removed components in the reverse order and reattach detached components.
-- Evacuate and fill the refrigerant circuit. Refer to Refrigerant Circuit (Refrigerant R134a Servicing, Refrigerant Circuit, Working with A/C Service Station) or Working with A/C Service Station .
-- Switch the ignition on.
-- Initiate the A/C system basic setting through the Thermal Management Control Module -J1024-, and activate the power-controlled valves through the stored routine Charge/flush the refrigerant circuit stop routine using the Vehicle Diagnostic Tester .
-- Operate the A/C system after charging the refrigerant circuit. Refer to A/C SYSTEM, STARTING AFTER CHARGING REFRIGERANT CIRCUIT .