Wire Junction Bracket, Removing and Installing
WARNING: This page is about a different car, the 2024 Audi SQ7, 2024 Audi Q7, 2023 Audi SQ7, and 2023 Audi Q7. However, it is still accessible from the selected car via links, so may be relevant.
-- Release the retainer in direction of -arrow A- and open the cover -1- in direction of -arrow B-.
-- Remove the bolt -1-.
-- Move the wire junction -2- with the wires connected to the side.
-- Free up the wire holder -1-.
-- Remove the nut -3- and then the bracket -2-.
Installing
Install in the reverse order of removal while noting the following:
-- Re-energize the 48V system. Refer to 48V SYSTEM, RE-ENERGIZING .
Tightening Specifications
- Vehicles with 48V System. Refer to Vehicles with 48V System .