LEMON Manuals: Even more car manuals for everyone
Home >> Audi >> 2017 >> A7 Quattro Competition >> Repair and Diagnosis >> External Pages >> Different car >> Section 92 (3.0L - Cylinder Head & VALVETRAIN - Engine Code: CPNB) >> 15 Cylinder Head, VALVETRAIN >> Cylinder Head >> Overview - Cylinder Head Cover

Overview - Cylinder Head Cover

WARNING: This page is about a different car, the 2015 Audi A7 Quattro and 2014 Audi A7 Quattro. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: The cylinder head cover for cylinder bank 2 (left) is shown in the illustration.
Fig 1: Identifying Cylinder Head Cover Overview
GWWA15-10966Courtesy of AUDI OF AMERICA, LLC
  1. Seal
    • For the cylinder head cover
    • Replace if damaged or leaking
  2. Cylinder Head Cover
  3. Grommet
    • Replace if damaged or leaking
  4. Seal
  5. Grommet
  6. Seal
    • For the cap
    • Replace if damaged or leaking
  7. Cap
  8. Hose
    • For the crankcase ventilation
  9. O-Ring
    • Replace
  10. Tension Clamp
  11. Sealing Bushing
    • For the fuel rail
  12. Fuel rail
  13. Bolt
  14. Bolt
  15. Fuel Return Hose
  16. O-Ring
    • Replace
  17. Injector
  18. O-Ring
    • Replace
  19. Copper Ring
    • Replace
  20. Bolt
    • 9 Nm
  21. Heat Shield
    • Not installed on all versions
  22. Bolt
    • With seal
    • Replace
    • Tightening specification and sequence, refer to Fig 2, Fig 3
Fig 2: Left Cylinder Head Cover - Tightening Specification and Sequence
GWWA15-10986Courtesy of AUDI OF AMERICA, LLC
NOTE: Replace the bolts that were tightened with an additional turn.

-- Tighten the bolts in three steps and in the sequence shown:

Step Bolts Tightening Specification/Additional Turn
1. -1 to 7- Install all the way in by hand.
2. -1 to 7- 8 Nm
3. -1 to 7- Tighten an additional 90°
Fig 3: Right Cylinder Head Cover - Tightening Specification and Sequence
GWWA15-10985Courtesy of AUDI OF AMERICA, LLC
NOTE: Replace the bolts that were tightened with an additional turn.

-- Tighten the bolts in three steps and in the sequence shown:

Step Bolts Tightening specification/additional turn
1. -1 to 7- Install all the way in by hand.
2. -1 to 7- 8 Nm
3. -1 to 7- Tighten an additional 90°