Secondary Air Injection Pump Motor -V101-, REMOVING AND INSTALLING: Installing
WARNING: This page is about a different car, the 2012 Audi Q5 and 2011 Audi Q5. However, it is still accessible from the selected car via links, so may be relevant.
- Tightening specification, refer to OVERVIEW - SECONDARY AIR INJECTION SYSTEM .
Install in reverse order of removal. Note the following:
NOTE:
Replace the O-rings.
-- Install the bumper cover noise insulation, refer to Front Bumper .
-- Install the noise insulation, refer to OVERVIEW - NOISE INSULATION .